Thursday, July 21, 2016
Progress Report
Most of you have heard the saying "No news is good news"; that's how this blog is. Slow and steady progression. All the rough-ins are done and signed off, and sheet rock is still being installed. New PA speakers arrived yesterday - Electro Voice model # ELX215.

Monday, June 13, 2016
Another Milestone
The Mighty Men of Valor have reached another milestone. The AC system is installed and operational. This feat was accomplished by sheer Holy Ghost power and a lot of sweat. Secondary to this accomplishment was running concealed sound system wiring from the platform to the sound booth. And..... the fellowship hall walls are getting sheetrock installed while the sheetrock in the sanctuary is getting finished. Sanctuary lighting is in and lighting at the platform is in work. It won't be long....
Pastor Kallam & Deacon Davila putting up sanctuary lighting
Working on HVAC ducting
Fellowship hall sheet rock being installed.
Fellowship hall wall framing in progresss
Deacon Knight assembling sanctuary lighting
Pastor Kallam, Deacons Davila and Sims, along with Bro Bryan doing final assembly of HVAC ducting.
Saturday, June 4, 2016
Sunday, May 15, 2016
Milestone
A milestone has been reached. The air handler has been delivered and set on the pad. More sheet rock is being installed.
Saturday, May 14, 2016
Friday, May 6, 2016
Sunday, May 1, 2016
Some of use took the day off from construction to attend the 2 year anniversary at ALC of Live Oak. Awesome service and great fellowship after service. A side benefit was to hear how good sound equipment should sound in a large venue. That location mimics our own open style sanctuary. Anyway, a couple of the guys continued hanging sheet rock..... The main walls that you see are about 14 feet tall and the sound booth floor decking is complete. The added insulation is for sound control purposes.