Saturday, August 20, 2016

Looking Great

The sanctuary is looking great. The walls have been textured with a "knock down" finish and the primer is going on. Meanwhile the ladies are scraping excess texture off of the floor in preparation for the "glue down" carpeting. The completion estimate is about a month from now.






Tuesday, August 16, 2016

So Much Progress

So much progress has been made; it is amazing. The photos shown here just do not do justice to the hard work the dedicated saints (with the Pastor leading the way) have made. All the sheet rock is finally up and the finishers are scheduled to be spraying texture this week (Aug 15, 2016). The main lighting fixtures are installed so we can get a better look and feel for the sanctuary space. The platform is cleaned up and you can see just how much space ther is. Won't we have a time......



















Sunday, July 31, 2016

Speaker & Mic Test

We were able to hook up the PA speakers and give them a short test drive yesterday. They sound real clear, but the real test will come when the complete system is installed in a completed sanctuary. Yesterday's test was to ensure that the overhead cables were in good working order. So yes, we did make noise, and the pre-wired XLR mic cables also work!

Thursday, July 21, 2016

Progress Report

Most of you have heard the saying "No news is good news"; that's how this blog is. Slow and steady progression. All the rough-ins are done and signed off, and sheet rock is still being installed. New PA speakers arrived yesterday - Electro Voice model # ELX215.


Image result for ev elx215Image result for ev elx215

Monday, June 13, 2016

Another Milestone

The Mighty Men of Valor have reached another milestone. The AC system is installed and operational. This feat was accomplished by sheer Holy Ghost power and a lot of sweat. Secondary to this accomplishment was running concealed sound system wiring from the platform to the sound booth. And..... the fellowship hall walls are getting sheetrock installed while the sheetrock in the sanctuary is getting finished. Sanctuary lighting is in and lighting at the platform is in work. It won't be long....








Pastor Kallam & Deacon Davila putting up sanctuary lighting






 Working on HVAC ducting
 Fellowship hall sheet rock being installed.
 Fellowship hall wall framing in progresss
 Deacon Knight assembling sanctuary lighting


 Pastor Kallam, Deacons Davila and Sims, along with Bro Bryan doing final assembly of HVAC ducting.


Sunday, May 15, 2016

Milestone

A milestone has been reached. The air handler has been delivered and set on the pad. More sheet rock is being installed.