Sunday, May 15, 2016

Milestone

A milestone has been reached. The air handler has been delivered and set on the pad. More sheet rock is being installed.








Saturday, May 14, 2016

It may look like nothing is happening, but it is. 

 


 This is where the sound control "room" will be.

 HVAC system pad is ready for the air handler


 HVAC return air/filter openings
Reinforcing the floor above the sound control room.

Friday, May 6, 2016

May 6, 2016

More work is accomplished. The second set of stairs at the front of the platform are done, only the left side to do. The sheet rock has been started in the sound booth.




Sunday, May 1, 2016

Some of use took the day off from construction to attend the 2 year anniversary at ALC of Live Oak. Awesome service and great fellowship after service. A side benefit was to hear how good sound equipment should sound in a large venue. That location mimics our own open style sanctuary. Anyway, a couple of the guys continued hanging sheet rock..... The main walls that you see are about 14 feet tall and the sound booth floor decking is complete. The added insulation is for sound control purposes.