Monday, June 13, 2016

Another Milestone

The Mighty Men of Valor have reached another milestone. The AC system is installed and operational. This feat was accomplished by sheer Holy Ghost power and a lot of sweat. Secondary to this accomplishment was running concealed sound system wiring from the platform to the sound booth. And..... the fellowship hall walls are getting sheetrock installed while the sheetrock in the sanctuary is getting finished. Sanctuary lighting is in and lighting at the platform is in work. It won't be long....








Pastor Kallam & Deacon Davila putting up sanctuary lighting






 Working on HVAC ducting
 Fellowship hall sheet rock being installed.
 Fellowship hall wall framing in progresss
 Deacon Knight assembling sanctuary lighting


 Pastor Kallam, Deacons Davila and Sims, along with Bro Bryan doing final assembly of HVAC ducting.