It really is happening..... Permits have been issued (framing, electrical, plumbing, and mechanical) and work is progressing. So much work is now done that county inspections and sign-offs have been completed for the plumbing and electrical. Framing needs to be reinspected because of insulation that was not installed. Hooray.......

Pastor called a work night for Tuesday (yesterday) and although it doesn't appear like much got done, there were some milestone items that did. The pad for the outside air handler is framed and ready for concrete, the platform subflooring was started and the sound room was cleaned out in prep for the subfloor. A couple of the men got the last bit of insulation installed for the framing inspection. The ladies did a superb job of cleaning up the men's messes. It was a good night.